Underbench Cabinet: Completion of Cabinet
These
are final pictures of Stage One. "Stage One" - what does
that mean? Well, the first step is to build the cabinet under the
bench. The second stage will be to fit out the drawers for the tools.
I plan to do some of the latter shortly, and some later. I will post
these as they are done. For now, here is the underbench cabinet
...
The rear, before the back was installed ...
The
front. The ring pulls are antiqued brass (they are not shiny). I need
to work them a little more to remove the still-new look. These were
chosen as they drop down and do not project out from the front of the
cabinet ...
Under
the bench ...
The
bench top received a little flattening, and a single coat of danish
oil ...
Someone
is sure to ask why the cabinet is low. The answer is that there needs
to be space for hold downs ...
The
drawers manage about 90% extension ...
One
of the first fit outs will involve this set of Kiyohisa bench chisels
I have been collecting one-by-one (these are no longer available)
...
And
here is one of the small drawers ...
Thanks
for supporting the build to date. Hopefully there were some aspects
that will prove helpful.
Regards from Perth
Derek
March 2021